Harnessing fusion - the power source of the sun - has long been a dream, as it could provide an almost limitless supply of energy in an environmentally responsible way. With the construction of a new reactor-scale fusion device, ITER, about to start in Cadarache in the south of France, that dream will come a large step closer to reality. Fusion research: recreating on earth the kinds of reactions observed in the sun The idea of extracting the net energy from controlled fusion reactions is nothing new. The difficulty has been recreating on earth the kind of reactions observed in the sun. Unlike fission (splitting apart) of heavy nuclei, fusion of light nuclei requires extreme conditions to be attained and sustained. The chosen reaction in experiments here on earth is the fusion of deuterium and tritium - two heavy forms of hydrogen - producing helium and a neutron, which carries the excess energy. This requires a high temperature (or energy) of the particles in a super-hot ionised gas called a plasma: around 150 million degrees Celsius. This must be combined with a sufficient density of particles and a confinement method that enables the plasma energy to be held inside the plasma long enough for the fusion reaction to become established and for more power to be released than is needed to keep the fuel hot. One important feature of fusion energy, and one which distinguishes it from fission, is that fusion is not a chain reaction. This makes it inherently safe: there is no possibility of a 'runaway' reaction. At any one moment, only a few grams of fuel are present in the plasma vessel, enough for a minute of burn time. To stop the reaction, it suffices to stop the supply of fuel, just like in a gas oven.
Heating the plasma to such extreme temperatures requires several complementary methods. One of these methods consists of passing a powerful electrical current through the plasma, while additional heating power is provided by externally injected microwaves and beams of neutral particles.
The programme of work on JET is organised and co-ordinated by the European Fusion Development Agreement. As the largest operating tokamak in the world and the only one capable of operating with both fusion fuels (deuterium and tritium), JET has obtained the necessary conditions in the plasma for fusion to occur. More crucially, JET has provided valuable lessons in how to maintain plasma stability and confinement in the face of a host of plasma instabilities. The measured fusion output power in JET (approximately 16 megawatts) is close to, but still lower than, the power required to maintain the plasma at fusion temperatures (25 megawatts). Less power out than in - not promising for a power station! However, scaling studies using data from JET and smaller fusion experiments tell us that a larger machine will reverse this balance, producing a much larger fusion output power than the power needed to heat the plasma.
As its name suggests, ITER is an international project with seven partner organisations: the EU, Japan, USA, South Korea, China, Russia and India. The design - using cutting-edge technologies such as superconducting magnetic field coils and advanced instrumentation - is already finished and a decision was taken in June 2005 to build the device at Cadarache in the South of France. Preparations are now underway to start construction, ready for operations to commence in 2015. One issue that inevitably arises with this technology is the use of radioactive tritium. In a future fusion power plant, tritium will be made inside the reactor itself in a closed cycle, so no transport of radioactive material outside the plant will be necessary during operation, and only a limited quantity will be present in the plant. The inside of the plasma vessel will become radioactive during the operation of the plant due to the neutrons produced in the fusion process. However, if the appropriate materials are used, these can either be disposed of as non-radioactive waste or recycled after a period of about 100 years, owing to their relatively short half-life. This compares favourably with the many thousands of years required before the components of a fission reactor become safe to handle. Part of the fusion research programme focuses on developing these 'low-activation' materials. ITER is essential for testing and integrating the various technologies on the scale of a power station, and should confirm that it is possible to build a fusion power station. However, before a fusion power station can be built, years of testing of the materials under working conditions will be required before a licence is granted, to ensure that it is safe and reliable. This can only be done in a special device called the International Fusion Materials Irradiation Facility (IFMIF). ITER, which will cost some €5 billion, and IFMIF, which will cost slightly under €1 billion, are key to the development of fusion as a workable energy source. Although these costs may sound high, they are very small on the scale of the total world energy market, approximately €3 trillion per year. So, the big question is 'when will fusion produce electricity for the world?' Building and operating ITER and IFMIF in parallel should allow the first prototype fusion power station to produce power in 30 years' time. Although this is not soon enough for an imminent move away from fossil fuel energy sources, it will enable fusion to provide a very valuable extra energy option for the latter half of the 21st century.
|